Galoc set to resume production

THE Galoc Production Company has safely connected the floating, production, storage and offtake vessel to the mooring and riser system at the Galoc oil field in the offshore Palawan Basin, Philippines.

Galoc set to resume production Galoc set to resume production Galoc set to resume production Galoc set to resume production Galoc set to resume production

Otto Energy, which holds a 31.38% stake in GPC, added the southwest portion of the hold back mooring system has been installed, and systems on the FPSO are being tested.

loader
  • NEW: Digital version of PNG Report magazine - View here
  • Porgera: Barrick-PNG talks go on - Read more
  • Follow the companies investing in the PNG market - Read more